Detailed Product Description
ORIGIN
Seller's Option Except China
PRODUCT QUALITY AND SPECIFICATIONS
United States Standard ASTM C 150 or
British Standard BS 12/1996
CHEMICAL COMPOSITION
|
SILICON DIOXIDE (SIO2)
|
21.00
|
|
ALUMINIUM OXIDE (A12O3)
|
5.30
|
|
FERRIC OXIDE (FE2O )
|
3.30
|
|
CALCIUM OXIDE (CAO)
|
65.60
|
|
MAGNESIUM OXIDE (MGO)
|
1.10
|
|
SULPHUR TRIOXIDE (SO3)
|
2.70
|
|
LOSS OF IGNITION (LOI)
|
0.90
|
|
TRICALCIUM SILICATE (C3S)
|
60.00
|
|
DICALCIUM SILICATE (C2S)
|
15.00
|
|
TRICALCIUM ALUMINATE (C3A)
|
8.05
|
|
TRICALCIUM ALUMINO FERRICE (C4AF)
|
9.76
|
PHYSICAL AND MECHANICAL PROPERTIES
|
BLAIN CM2/GR
|
3.250
|
|
AUTOCLAVE EXPANTION
|
0.02
|
|
INITIAL SETTING TIME (VICAT)
|
105 MINUTES
|
|
FINAL SETTING TIME (VICAT)
|
135 MINUTES
|
|
COMPRESSIVE STRENGTH
|
(@) 03 DAYS 230 KG/CM2
(@) 07 DAYS 305 KG/CM2
(@) 28 DAYS 420 KG/CM2
|
Compressive strength mortar Mpa (N/mm):
Strength Class: 42,5N
Early Strength: 2 days 10.00
Strength Class: 42,5R
Early Strength: 2 days 20.00
Standard 28 days strength: Minimum 42,5 . Maximum 62,5
PRICE LIST GUIDE
|
Total Volume
|
Monthly
|
Agreed Price
|
|
Over 12 Months
|
Shipments
|
In US Dollars
|
|
300,000 *
|
25,000
|
77.00
|
|
600,000 *
|
50,000
|
75.00
|
|
900,000 *
|
75,000
|
73.00
|
|
1,200,000 **
|
100,000
|
72.00
|
|
1,800,000 **
|
150,000
|
70.00
|
|
2,400,000 **
|
200,000
|
69.00
|
|
3,600,000 **
|
300,000
|
68.00
|
|
4,800,000 **
|
400,000
|
66.00
|
|
6,000,000 **
|
500,000
|
63.00
|
|
9,000,000 **
|
750,000
|
61.00
|
|
12,000,000 **
|
1,000,000
|
60.00
|
|
15,000,000 **
|
1,250,000
|
59.00
|
Non-Transferable LC - Add $2 per MT
*Volumes below 1m MT (per annum)
Require a FFRSBLC valid for 16 months (based on a 12 month contract)
**Volumes above 1m MT (per annum)
Require a one month SBLC (or BG) valid for 16 months (based on a 12 month contract) and a MRLC for the monthly volumes valid for 16 months (based on a 12 month contract).
Payments by TT require a three month SBLC (or BG) to be in place for the contract period, valid for 16 months (based on a 12 month contract).
- Overpricing is not allowed.
- Pricing is based on the fist year annual volumes
- 32.5 Cement Subtract $5 per MT
- 52.5 Cement Add $5 per MT
- SABS Certified cement (South Africa) Add $7 per MT
- GOST Certified cement (Russia) Add $20 per MT
- SPOT contract available min 12,500MT Contact for pricing
PROCEDURES
1. Buyer issues a Letter of Intent (LOI) or an Irrevocable Corporate Purchase Order (ICPO) to Seller
2. Seller sends a Full Corporate Offer (FCO) to Buyer
3. Buyer sends back to Seller the countersigned FCO in acceptance of general terms and conditions
4. Seller sends draft contract to Buyer
5. Buyer signs and returns the draft contract to Seller
6. Seller reviews Buyers changes made in the draft contract, if any
7. In case Seller agrees to the changes made by Buyer, Seller signs and sends back final contract to Buyer who also signs the contract and returns it to Seller
8. Within FIVE (5) working days from date of signing and sealing the Final Contract and having sent it back to Seller, Buyers bank confirms willingness to start transfer of contract quantity and to issue the related payment instrument
9. Within SEVEN (7) working days from receipt of the RWA via SWIFT from Buyers bank, Sellers bank sends the Proof of Product (POP) for the contracted quantity to Buyers bank
10. Within FIVE (5) banking days from receipt of POP, Buyers bank sends the Operative Payment Instrument to Sellers bank
11. Within TEN (10) banking days from receipt of the Operative Payment Instrument, Sellers bank sends PB to Buyers bank
12. Shipping of Goods will start within THIRTY (30) to FORTY FIVE (45) days after Sellers bank received the acceptable Operative Payment Instrument from Buyers bank
SELLER'S GUARANTEE
Performance Bond: 2%